Assembly Insurance
Assembly Insurance (EAR), during the realization of an assembly project; It is an All Risks insurance that covers all kinds of sudden and unexpected damage that may happen to the preparation materials or related assembly equipment, work machines, which are at the construction site at that time, for the works that have been done so far and the parts to be carried out in the next stages. The guarantee period starts from the moment the assembly materials land on the assembly area and ends with the completion of the tests and commissioning of the machines whose assembly is completed. During this period, many material damage may occur due to technical reasons or human-induced. Near East Insurance Installation All Risks Insurance covers all kinds of sudden and unexpected risks that may occur during the assembly of your machinery and equipment or during post-installation tests.
Who are the Insured Parties in Assembly Insurances?
Employer (General Owner of the Project): It is the party that provides the insured construction site and is often in the planning phase and provides the material in some projects. The main beneficiary is the employer. Main Contractor: The party assigned by the employer, responsible for the construction and/or assembly works of the entire project, and able to delegate some of the works to subcontractors. The Insured is the main contractor. Subcontractor (Subcontractors): The party that undertakes all (turnkey) or part of a construction and/or assembly work and is assigned directly by the employer or the main contractor.
When Does Assembly Insurance (EAR) Start, What Are Its Stages?
Insurance starts with the landing of the first production item on the construction site. Then, the insurance ends with the completion of the works and their delivery to the employer. In EAR Insurances, a 4-week test experience period is also included in the coverage. In some cases, the contractor company cannot deliver all the promised works. However, these unfinished parts are detailed works (such as the connections of heating boilers) that will not affect the commissioning or commissioning of the construction or assembly project. In such a case, if the control engineers assigned by the insured deem it appropriate and there is a provision in the construction contract regarding this situation; then provisional acceptance is made. In the meantime, the contractor completes the remaining work and final acceptance is made.
What are the Major Risks Covered by Assembly Insurance?
Damages during fire, lightning, explosion, extinguishing
Flood, inundation, rain, snow, sea waves
Plane crash, parts falling from plane
Storm
Earthquake
Landslide, landslide, rockfall
Theft, attempted theft
Human-induced damages (carelessness, negligence, etc.)
Electrical damages (short circuit, spark, arc etc.)
Business accidents
What are the Differences Between Construction Insurance (CAR) and Assembly Insurance (EAR)?
Most of the time, it can be difficult to find an answer to the question of whether the works are assembly or construction work in projects that include both construction and assembly works. In such cases, which type of work constitutes more than 50% of the total cost of the work by the insurer; that part will be based on the branch to be studied. The application area of CAR Insurance is quite wide and therefore it is more known and demanded. However, it is possible to include construction works in the Assembly Insurance policy. For example; EAR Insurance covers the construction of a factory on an empty land and then the assembly of the machines that will work in it. The EAR insurance also includes a test/experience period following the completion of the assembly work (4 weeks in accordance with the General Conditions of Assembly Insurance). This period includes testing whether the installed machines are working or not. This period can be considered as the most risky and damaging part of the business.